Click here to skip the navigationCity of Cupertino Logo.   Contact Us | Event Calendar | FAQ |  Recreation Schedule |  Site Map |  
City Government.  
About Cupertino.Cupertino Living.Doing Business.Just Visiting.City Government.  
  Home Page : City Government : Departments And Offices : Planning And Building : Development Activity : Application Phase : Development Activity Report  
City Council
Commissions
Committees
Agendas and Minutes
Departments and Offices


City Channel
Municipal Code
Publications List
Directory
City  Government Org Chart



    DEVELOPMENT ACTIVITY REPORT — MAY 2008
COMMERCIAL PROJECTS

Approved But Not Built
  • Cupertino Village
  • Tantau Retail and Parking Garage
  • Tantau Office Building
  • Cupertino Square Restaurant Pads (Vallco)
  • Cupertino Square Improvements
  • Rose Bowl Mixed Use Project


  • Under Construction
  • Benihana
  • Marketplace Shopping Center - Development Activities and New Tenants
  • Office Building (Former Any Mountain Site)


  • REPORT'S OTHER SECTIONS
  • Mixed Use Projects
  • Residential Projects
  • City Projects



  • Approved But Not Built

    Cupertino Village
    Location:
    Northwest corner of Wolfe Avenue and Homestead Road.

    Developer: Kimco Realty
    Architect: MCG
    Project Manager:Gary Chao

    Application Summary:
    1. USE PERMIT and ARCHITECTURAL AND SITE APPROVAL to construct two, one-story retail buildings totaling 24,455 square feet and a two level parking structure.
    Project Data:
    Residential
    Lot Size: N/A
    Type: N/A
    Units: N/A
    Density: N/A
    Height: N/A
    Commercial
    Lot Size: 12.5 acres
    Type: Retail Building and Parking Structure
    Size: Retail: 24,455 square feet, Garage: Approx. 54,000 square feet (footprint)
    Height: Retail: 22 feet, Garage: 15 feet

    Status:
  • The project was reviewed by Planning Commission on November 13, 2007, January 8, 2008, and March 25, 2008.
  • The applicant hosted three neighborhood meeting on July 11. 2007, November 8, 2007, and December 13, 2007.
  • The City Council considered this project on April 1, 2008 and April 15, 2008. The Council adopted the mitigated negative declaration and approved the project, including but not limited to the following key conditions:
    • - Eliminate pedestrian or vehicular access along Linnet Lane.
      - Enhance the refuse and recycling facilities.
      - Enhance the center’s security patrol and maintenance program.
      - Require a landscaping improvement/maintenance bond.
      - Implement a construction management plan (establish a complaint hotline).
      - Limit the Homestead Road driveway to allow only right-in and right-out and a sheltered left vehicular movements.
      - Provide at least 855 physical parking spaces on the ground (not including the extra stalls gained at the church).
      - Implement a transportation demand management plan.
      - Kimco shall work with staff to refine the final parking plan and obtain Fire and Public Works Department approval prior to issuance of building permits.
      - With the concurrence of the church board, Kimco shall restripe the church parking lot to gain extra stalls for the church.
      - Council reserves the right to require applicant/property owner to provide valet parking if needed.
      - Provide a one-way right-turn only egress driveway immediately north of the Duke of Edinburgh along the Wolfe Road shopping center frontage.
    Visual:
    Site Plan
    Site Plan

    Pedestrian Gateway along Linnet Lane
    Pedestrian Gateway along Linnet Lane

    Decorative Screen Wall along Linnet Lane
    Decorative Screen Wall along Linnet Lane

    Cupertino Village, Linnet Lane Cross Section
    Cupertino Village, Linnet Lane Cross Section


    Tantau Retail and Parking Garage
    Location:
    Northeast corner of Stevens Creek Boulevard and North Tantau Avenue.

    Developer: Chang Architecture & Planning
    Architect: Chang Architecture & Planning
    Project Manager: Aki Honda-Snelling

    Application Summary:
    1. USE PERMIT and ARCHITECTURAL AND SITE APPROVAL to construct a 10,582 square foot retail building and one-level parking garage on an existing office site.
    2. EXCEPTION to the Heart of the City Specific Plan for a front yard setback.
    3. TENTATIVE MAP to subdivide a 9.4 acre site into two parcels, approximately 1 acre and 8.4 acres respectively.
    4. TREE REMOVAL PERMIT for tree removal and replanting in conjunction with a proposed 10,582 square foot retail building and one-level parking garage on an existing office site.
    Project Data:
    Residential
    Lot Size: N/A
    Type: N/A
    Units: N/A
    Density: N/A
    Height: N/A
    Commercial
    Lot Size: 9.4 acres
    Type: Retail Building and Parking Garage
    Size: Retail: 10,582 square feet, Garage: 26,500 square feet
    Height: Retail: 31 feet, Garage: 14 feet

    Status:
  • Approved by City Council on August 21, 2007.

  • Recent change of ownership to Rockwood Capital.

  • Visual:
    Conceptual Rendering of Proposed Retail Building
    Conceptual Rendering of Proposed Retail Building


    Tantau Office Building
    Location:
    10900 N. Tantau Avenue, East side of N. Tantau Avenue, south of Homestead Avenue and Forge Drive.

    Developer: Larry Wallerstein, Tantau Investments, LLC
    Architect: N/A
    Project Manager: Aki Honda-Snelling/ Piu Ghosh

    Application Summary:
    1. USE PERMIT and ARCHITECTURAL AND SITE APPROVAL to construct a 100,000 square foot, two-story office building with site improvements.
    2. TREE REMOVAL PERMIT for the removal of 37 trees to construct a 100,000 square-foot, two-story office building with site improvements.
    3. ENVIRONMENTAL DETERMINATION: Negative Declaration recommended. The project will have no significant, adverse environmental impacts with the proposed mitigation measures.
    Project Data:
    Residential
    Lot Size: N/A
    Type: N/A
    Units: N/A
    Density: N/A
    Height: N/A
    Commercial
    Lot Size:6.6 acres
    Type: Office Building
    Size: Retail: 100,000 square feet: First Floor is 50,320 square feet, Second Floor is 49,680 square feet
    Height: 35.5 feet

    Status:
  • The project was reviewed by Planning Commission on December 11, 2007. Planning Commission recommended approval to City Council 3-0.
  • The project was approved at City Council on January 8, 2008.


  • Applied for the building permits March 2008.
  • Groundbreaking scheduled for April 2008.
  • Visual:
    Conceptual Rendering
    Conceptual Rendering


    Cupertino Square Restaurant Pads (Vallco)
    Location:
    Northwest corner of Stevens Creek Boulevard and Wolfe Road in Sears’ parking lot

    Developer: Cupertino Square
    Architect: CPK- STDR Architects
    Project Manager: Aki Honda-Snelling

    Application Summary:
    1. Use Permit and Architectural and Site Review to construct a 5,910 square foot restaurant (Islands Restaurant) and a 6,020 square foot restaurant (California Pizza Kitchen) on the northwest corner of Stevens Creek Boulevard and Wolfe Road.
    2. Tentative Map to create two parcels, approximately 15,150 and 19,360 square feet respectively, at the southwest corner of Stevens Creek Boulevard and Wolfe Road.
    3. Architectural Site Approval for exterior signs, canopy and awnings for California Pizza Kitchen (Vallco Fashion Park)

    Project Data:
    Residential
    Lot Size: N/A
    Type: N/A
    Units: N/A
    Density: N/A
    Height: N/A
    Commercial
    Lot Size: 12.4 acres
    Type: Two Retail Restaurant
    Size: 12,000 square feet (6,000 square each)
    Height: 21 to 30 feet

    Status:
  • Approved by City Council on April 4, 2006.
  • The Planning Commission approved the Tentative Map on October 10, 2006.
  • The building permit for California Pizza Kitchen was issued on October 26, 2006. Construction on hold pending underground utility issues being resolved.
  • The building permit for California Pizza Kitchen’s signs was issued on May, 18, 2007.
  • Island restaurant is no longer considering the second pad.
  • The second restaurant pad being considered by Islands is now available.


  • Visual:
    Island Site Rendering
    California Pizza Kitchen


    Cupertino Square Improvements
    Location:
    Wolfe Road between Stevens Creek Blvd. and I-280.

    Developer: Cupertino Square
    Architect: Perkowitz & Ruth Architects
    Project Manager: Gary Chao

    Application Summary:
  • Use Permit and Architectural and Site Review to construct 138,760 square feet of new retail space and a parking structure


  • Project Data:
    Residential
    Lot Size: NA
    Type: NA
    Units: NA
    Density: NA
    Height: NA
    Commercial
    Type: Retail and parking structure
    Size: N/A
    Height: N/A

    Status:
  • Parking garage near completion pending retail development.
  • Retail space fronting the parking garage was reviewed by the City Council in March 2008, and construction is expected to begin in the 4th quarter of 2008
  • Tenant improvements in review or under construction: Steve and Barry’s, Hoffbrau House, and Food Court tenants.


  • Visual:
    Perspective at Wolfe Road
    Conceptual rendering of new retail space at the northeast corner of Wolfe Road and Vallco Parkway. The parking garage is open; retail space has not been constructed.

    Site Photo
    Site Photo


    Rose Bowl Mixed Use Project
    Location:
    Wolfe Road between Stevens Creek Blvd. and I-280.

    Developer: Cupertino Square
    Architect: Perkowitz & Ruth Architects
    Project Manager: Gary Chao

    Application Summary:
    1. Tentative Map to create for 204 residential condominium units on an approximately seven acre parcel (Rosebowl).
    2. Architectural and site review for a previously approved use permit for 204 residential units, 105,200 square feet of new retail space and a parking structure

    Project Data:
    Residential
    Lot Size: 7.47 acres
    Type: Residential
    Units: 204
    Density: 27 dwelling units/acre
    Height: 45-60 feet
    Commercial
    Type: NA
    Size: NA
    Height: NA

    Status:
  • Approved by the City Council on March 15, 2005.
  • Site sold to Evershine Group in September 2007.
  • City Council reviewed Evershine’s plans, which are substantially the same as the original approval, in March 2008. Construction expected to begin in the 4th quarter of 2008.


  • Visual:
    Rose Bowl Site
    Rendering of approved retail/residential project on east side of Wolfe Road


    Under Construction

    Benihana
    Location:
    Southwest corner of Wolfe Road and Hwy. 280 in the Cupertino Square Shopping Mall

    Developer:Orbit Resources/Benihana
    Architect:WD Partners
    Project Manager: Gary Chao

    Application Summary:
  • Architectural and Site Approval for Building C and exterior modifications and an outdoor seating area for Building B at Marketplace Shopping CenterExterior building enhancement and interior tenant improvement to an existing Benihana restaurant located in the Cupertino Square Shopping Mall.
    Project Data:
    Residential
    Lot Size: N/A
    Type: N/A
    Units: N/A
    Density: N/A
    Height: N/A
    Commercial
    Type: Restaurant
    Size: 8,788 square feet
    Height: N/A

    Status:
  • Plans have been approved by the City.
  • Tenant improvement work underway.
  • Sign program anticipated to be reviewed by the City in the 2nd quarter of 2008.


  • Visual:
    Proposed graphic panels at northwest wall of building
    Proposed graphic panels at northwest wall of building

    Proposed Entry Feature
    Proposed Entry Feature

    Site Photo
    Proposed Entry Feature


    Marketplace Shopping Center - Development Activities and New Tenants
    Location:
    Southeast corner of Stevens Creek Blvd. and Portal Ave.

    Developer: Evershine Group
    Architect: Ko Architects, Inc.
    Project Manager: Gary Chao

    Application Summary:
  • Architectural and Site Approval for Building C and exterior modifications and an outdoor seating area for Building B at Marketplace Shopping Center


  • Project Data:
    Residential
    Lot Size: N/A
    Type: N/A
    Units: N/A
    Density: N/A
    Height: N/A
    Commercial
    Lot Size: 9.9 acres
    Type: Retail
    Size: 34,300 square feet
    Height: 33 feet 4 inches

    Status:
    Building C
  • Building C Approved by City Council on February 7, 2006, with directions for the applicant to make minor revisions to the plan and return to Design Review Committee at a later date.
  • Architectural and landscape details were approved by Design Review Committee on April 19, 2007.
  • The building plans for Building C have been approved. Construction underway.
  • New Tenants
  • New lease approved for Yogurtland (frozen self serve yogurt store)
  • New lease approved by the Evershine Group for a new Japanese Supermarket Marukai and Daiso (Japan's No.1 ranking “livingware” supplier) at the former Long’s space. This will be the first South Bay location for both retailers.
  • Marukai and Daiso, and Yogurtland have been allowed to proceed subsequent to City Council decision on January 8, 2008 defining food preparation limitations. Demolition plans have been approved.
  • Marukai and Daiso’s building plans are currently under review and construction estimated to begin in the 2nd quarter of quarter of 2008.
  • Yogurtland is now open.


  • Visual:
    Conceptual Rendering
    Conceptual Rendering

    Building C Under Construction
    Building C Under Construction


    Cupertino Landing Office Building (Former Any Mountain Site)
    Location:
    Southwest corner of N. De Anza Blvd. and Mariani Ave.

    Developer: Sand Hill Property Company
    Architect: Chang Architecture
    Project Manager: Colin Jung

    Application Summary:
  • USE PERMIT and ARCHITECTURAL AND SITE approval to construct a 60,000 square foot, 3-story, office building and a 3-4 level parking structure.
  • TREE REMOVAL PERMIT for tree removal and replacement.


  • Project Data:
    Residential
    Lot Size: NA
    Type: NA
    Units: NA
    Density: NA
    Height: NA
    Commercial
    Lot Size: 1.7 acres
    Type: Office building and parking structure
    Size: Office: 60,000 square feet, Garage: 214 stalls
    Height: Office: 45 feet, Garage: 28’-6”

    Status:
  • City Council approved the project on reconsideration on October 17, 2006.
  • The Design Review Committee approved the design of the parking structure on September 21, 2006.
  • The project is nearing completion and should be completed by second Quarter of 2008.


  • Visual:
    Site Photo
    Site Photo